-
Collect all of the props needed for my photography shoot, including the, Brick Squad Chain, MMG Hoodie, Gold Rings, Replica Gun all to be collected by Harry.
-
I have obtained all of the props i needed, and am now looking to plan a date for my shoot. I Have recieved the Brick Squad Chain, MMG Hoodie, Gold Rings & Replica Gun from Harry.
-
By this date i need to ensure my models, Harry & Louis are free and available for the shoot on saturday.
-
Today i was assured that both my models, Harry & Louis are available for the shoto on Saturday.
-
On Saturday 7th January i wish to have completed all of the photography needed for my magazine, using my shot list to assist me.
-
All photos needed for the production of my magazine were taken.
-
Posting a draft of my magazine production on my facebook group to get feedback for improvements.
-
I have recieved some feedback from members of my audience focus group, i have blogged my feedback and ive looked into editing and updating for improvements.
-
Complete draft, Front, Contents & Double spread pages and post them to my faebook focus group for feedback
-
I was unable to upload all of my drafts so i have reset my target.
-
I have created my draft, and recieved feed back for all of them, front, contents & double page spread.
-
I have completed all of my pages and uploaded them to my blogger, u have finished before the deadline so now aim to work on the presentation of my blog.
-
This is the deadline for my entire project, i must complete all work by this date!