Production Schedule

  • Research and case studies

  • Music Video Treatment

  • Analysing the lyrics

  • Pre-production

    Storyboard completed
    Risk Assessments completed
    Recces complete
    Location release form completed
    Filming plan completed
    Production team roles completed
  • Planned first filming shoot

    Things did not go to plan as our actor could not learn the lyrics in the short time frame we gave him, as he was found last minute and we were against time. We did not film anything on this day
  • First day of filming

    We filmed for the first time today in the studio with our actor Emmanuel.
  • Editing

    This was the beginning of the editing process. We started to edit the footage we had so far.
  • Second day of filming

    For this day we booked a hotel room for Jhene, it was a location shoot.
  • Third day of filming

    We filmed twice this day, in the studio with drake so that we coul get some more shots of him and we had some girls come and get recorded for the roles of the females Drake mentions in his secon verse.
    Also we went to our location shoot in Limehouse with the backdrop of the city to film some more of Emmanuel as we did not have any of him at a location other than the studio.
  • Editing - Colour correction

    We needed to change the colour of some of the footage as some scenes were bright and some were too dark so we made it to a level that we liked.
  • Audience feedback on rough cut

    We showed our peers what we had of our music video so far and gained some feedback.
  • Final music video

    We had completed our music video
  • Research & planning - CD cover and advert/poster

  • CD cover and poster pitch

    We presented our ideas to our peers on what we had in mind and what had inspired us to include some things to our print products and gained some feedback.
  • Print production progress

    This was the progress of the CD packaging
  • Photoshoot for poster/advert

    We had a problem, as the photoshoot was not booked properly and the studio was in use so we had to use the recording studi which was fine as it had a black backdrop and floor
  • Final Digipak Production

    Everything is completed. This includes, the CD packaging, The CD and the poster/advert to promote the release of the album.
  • Evaluation