Hotel

Eagle Nest

By neving
  • Start Construction

    Start Construction
    This is the first day of construction. All of the building equipment and machines will get here today. We will get a little building done, but today will be almost totally for preparing for what is going to be ahead of us.
  • Period: to

    Eagle Nest Construction

    The entire time span is one year and three months.
  • Creating the Foundation

    Creating the Foundation
    Today we'll start digging up the ground so we can start putting the cement where the foundataion will be.
  • Cement

    We should have already dug up the ground where the building will be. We're trying to go at a pretty fast pace because if we finish early we'll get to open quicker which equals more money. Today we'll start putting in the cement, which will hold the entire structure.
  • Block #1

    Block #1
    After we finish putting in the cement we'll start constructing our building. The first step is to build block #1, which is right on top of the foundation of our building. Everything will be prefabricated in a factory in San Fransisco, so we can deliver supplies multiple times. We're going to start building the frame of all five sides, including the roof.
  • Block #1's Drywall, Gel, and Smashed Newspaper

    Okay, the frame of block #1 should be done by now. Time for the drywall, gel, and smashed newspaper. We're going to put a coating of get across the entire building. It helps conserve heat. Next we'll put the smashed newspaper. It's not really smashed newspaper, but it feels and looks like that so that's what I'll call it. It helps circulate the buildings are flow. Last but not least, we'll put a layer of drywall so that it'll actually start looking like a building.
  • Block #1's Windows

    Block #1's Windows
    Now that the drywall, gel, mashed newspaper is finished, it's time to start building the eco-windows and the main door.
  • Block #2

    Now that we finished block #1, time for block #2. We'll start building the frame on top of block #1.
  • Block #2's Drywall, Gel, and Smashed Newspaper

    Now we're going to do the same thing for block #2 as we did in block #1. We're going to put the drywall, gel, and smashed newspaper.
  • Block #2's Window

    Now we're going to install block #2's eco-windows.
  • Block #3

    Today we're going to start constructing block #3's frame.
  • Block #3's Drywall, Gel, and Smashed Newspaper

    We'll start putting the drywall, gel, and smashed newspaper for the third block today.
  • Block #3's Windows

    Today we'll add the eco-windows into block #3.
  • Interior Applications and Eco-Friendly Devices

    Now our entire structure is almost complete. The next (and maybe the most important) step is to include the lights, appliences, utilities, the entrance, the elevators, etc. We'll then also have to make our wind turbines, geo-thermal heating, solar panels, etc. After this step we'll almost be done with our whole structure.
  • Concrete Sidewalks

    Concrete Sidewalks
    The second to last step in building our strucutre is to put the concrete in for the sidewalks outside our building. We want our structure's entrance to be grand, so this step is essential for that goal.
  • Finishing Touches

    The last (but not least) step of the construction of this absolutely beautiful structure is to maake sure everything is in place for the big opening day. Some of these stuff are like to make sure that all the decorations are in place, to double-check that all the employees are ready to do their job, and basically just to make sure that everything is ready for our big introduction to the entire world of what amazing things our building, Eagle Nest, and our group, Skyline, has to offer.
  • Opening Day

    Opening Day
    Today our building is open to visitors and ready to for the big adventure that'll await us.