Vista PEAK

  • Forward thinking

  • Senate Bill 212-Colorado Achivement Plan 4 Kids (CAP4K)

  • Completion of P-20 Design

  • OPENING DAY WITH STUDENTS VISTA PEAK P-9

    Students from grades Preschool to 9th grade will be housed in the p-8 building while the high school is being built.
  • FIRST DAY WITH STUDENTS NEW HS

    The P-8 building with house students P-6th grade
    The high school will house students 7-10th grade
  • First day of Preschool

  • Vista PEAK Grand Opening

  • 1st anual Bison Stamped