Ap11mispat

Apollo 1-17

  • Apollo 1

    Apollo 1
    Failure due to cabin fire on launch rehearsal test.
  • Apollo 7

    The primary objectives for the Apollo 7 engineering test flight were simple: Demonstrate command and service module, or CSM, and crew performance; demonstrate crew, space vehicle and mission support facilities performance during a crewed CSM mission; and demonstrate CSM rendezvous capability.
  • Apollo 8

    The mission objectives for Apollo 8 included a coordinated performance of the crew, the command and service module, or CSM, and the support facilities. The mission also was to demonstrate translunar injection; CSM navigation, communications and midcourse corrections; consumable assessment; and passive thermal control. The detailed test objectives were to refine the systems and procedures relating to future lunar operations.
  • Apollo 9

    The primary objective of Apollo 9 was an Earth-orbital engineering test of the first crewed lunar module, or LM. Concurrent prime objectives included an overall checkout of launch vehicle and spacecraft systems, the crew, and procedures.
  • Apollo 10

    The Apollo 10 mission encompassed all aspects of an actual crewed lunar landing, except the landing. It was the first flight of a complete, crewed Apollo spacecraft to operate around the moon.
  • Apollo 11! (SUCCESSFUL LANDING)

    The primary objective of Apollo 11 was to complete a national goal set by President John F. Kennedy on May 25, 1961: perform a crewed lunar landing and return to Earth. SUCCESsFUL
  • Apollo 12

    The primary mission objectives of the second crewed lunar landing included an extensive series of lunar exploration tasks by the lunar module, or LM, crew, as well as the deployment of the Apollo Lunar Surface Experiments Package, or ALSEP, which was to be left on the moon's surface to gather seismic, scientific and engineering data throughout a long period of time.
  • Apollo 13

    Apollo 13 was supposed to land in the Fra Mauro area. An explosion on board forced Apollo 13 to circle the moon without landing. The Fra Mauro site was reassigned to Apollo 14.
  • Apollo 15

    Apollo 15 was the first of the Apollo "J" missions capable of a longer stay time on the moon and greater surface mobility.
  • Apollo 14

    The primary objectives of this mission were to explore the Fra Mauro region centered around deployment of the Apollo Lunar Surface Scientific Experiments Package
  • Apollo 16

    Three primary objectives were (1) to inspect, survey, and sample materials and surface features at a selected landing site in the Descartes region; (2) emplace and activate surface experiments; and (3) conduct in-flight experiments and photographic tasks from lunar orbit. Additional objectives included performance of experiments requiring zero gravity and engineering evaluation of spacecraft and equipment.
  • Apollo 17

    The mission was the final in a series of three J-type missions planned for the Apollo Program.