Lil wayne 920x584

chroilogical order

  • 1232 BCE

    (1)4:40 the cutters had finished the work.

  • 125 BCE

    (2) 4:45 some one pulled the fire alarm

  • 5

    (6) after the shirtwaist they took it up to the 10th floor for inspection

  • 5

    (7) they began to put on thick layers.

  • 7

    (5) 6:00 the made an inspection and there was not damage done

  • 12

    (4) 5:15 the broke the blaze control

  • Period: 212 to 18

    (3) 4:47 the fire people got there