-
Build Project-have everything in place eg. have grow bed on top of tank, pipes cut to right length
-
Attach pipes to pump, grow bed and tank. Cut holes in bottom of grow bed
-
Get float valve to right level (includes water input) to and have aerator and air stone attatched
-
Finish everything up and test if working
-
Reflect on project/write up
-
Write up
-
Write up
-
Polish/Submit