when the brige started to get built
-
In 1932, 96 steam locomotives were positioned in various ways to test the load capacity of the Bridge.
-
this is when the bridge officaly opened
-
It is reported that in 1943 a flight of 24 RAAF Wirraways flew under the Sydney Harbour Bridge, with one of the pilots changing his flight path at the last moment to go over the top of the Bridge only just clearing it in time.
-
it was the bridges 70th birthday