Tunnel

Chennai-Nashri Tunnel

  • Chennai-Nashri Tunnel

    Chennai-Nashri Tunnel

    The Deliverable was the Tunnel which is called as Dr. Syama Prasad Mookerjee also named as Chennai-Nashri Tunnel in the Jammu and Kashmir. The tunnel is the first, and the sixth, road longest tunnel in the world with a transverse ventilation system and cut 2 hours distance. Transverse ventilation will minimize tailpipe smoke within the tunnel to prevent suffocation and maintain visibility. The project cost was US$540 million Fixed: Time, Optimized: Cost, Accepted: Quality

A list shows items. A timeline shows sequence.

Use Timetoast to make dates, milestones, and turning points easier to understand in a clear visual format. Timetoast is a timeline maker for work, school, research, and stories.