On this trip we first saw WCC and started discussing purchase.
-
-
-
-
-
-
-
-
-
-
Abandoned due to necessity of construction standards
-
Learned Report Builder in WoodCAD/CAM.
Developed a "report" in WCC that automatically creates a very informative cutlist for Production. -
-
-
-
-
-
-
-
Evaluated each piece of equipment and came to agreement with Production how each would be used.
-
Multiple meetings to agree on standards, and then develop a module in ProMan with IT.
-
-
Just like current systems, Customs are an anomaly that have to be handled differently. We had to develop a numbering system within WCC to handle these one-off products.
-
-
-
-
-
-
-
-
-
-
This was a frustrating day. Overnight and with no real notification, all customs were changed to part numbers. Over 50 customs were already completed and in the system and had to all be recreated as part numbers. This event wheelspun Engineering for most of a month.
-
Forced upgrade due to WCC v12
-
Forced upgrade due to WCC upgrade to v12
-
This upgrade completely went south. WCC was down for part of a week, and had to get multiple top-level techs to solve a license dongle issue
-
-
Continuous updates to develop work flow
-
Analyzing the path of every part and FG through the plant and working to make constructions more LEAN.
-
-
-
-
Not done at Eko, but other machines that scan will scan 8/1/18
-
-
Functional 8/9/18
-
Standards Module Review with Engineering 4/20/18
PJM Review of Standards 5/2/18
WCC New Parts discussion 5/16/18
Standards Round Two Push 6/7/18
New Update to Standards Module 8/30/18
Continued Part Number Discussion 8/30/18
New Part Number Decision- Add "W" when to long change "-" to "_" 9/5/18 -
-
Refine the cutlist report to group like materials on the cutlist.
Approved 9/5/18 -
-
-
Harrison Hayes
-
-
-
Renamed to Production Verified 8/3/18
Stamp for Drawing created 8/8/18 -
Our flash report does not count customs, so thought it important to note that above regular product, we have another 106 customs in WCC. WCC is a great tool for rapid response to CUSTOMS.
-
-
-
Develop strategy for Engineering to convert all .CIX programs to .BPP files before transfering to the machine.
-
Started Water Jet 6/12/18
New CNC Process to reduce cost 8/24/18 -
Develop and Implement the Re-Verify Process
-
This will update all boxes to AFI construction standards.
-
This was taken care of only in engineering and went very smoothly 6/4/2018
-
Needed a new process for the quantity of product without part numbers
-
Engineering started replacing Cut and Cut/Edgeband panels in laserfiche
-
Moved 110,000 files, Organized 50,000 files and folders
-
First Developed as Lay-up 7/5/18
Sporadically changed to Melamine starting 7/23/18
Decision to change to MDO bases 8/23/18
Electrical box hole change, and overhang construction PCR 8/30/18 -
Access Panel R&D 1 (7/10/18)
Access Panel R&D 2 (7/24/18)
Cut Rite Verification (7/24/18)
Access Panel Approved (7/31/18) -
-
-
-
First Models Ship 8/2/18
Redlines 8/17/18
Models out sourced and In-house 9/4/18
All model due date 9/30/18 -
-
Engineering Checklist Created 8/10/18
PC Checklist Created 8/27/2018 -
Requested to get pricing on 8/3/18
Approval for the change on 8/23/18 -
Programs run, need time for further testing
-
Requested clarification on part numbers and standards before continuing 8/8/18
-
Testing out the movement and deletion of programs in the destination folders.
Main part of the program is functional ready for implementation when programs are moved to the G-drive in the correct folder structure. -
-
-
-
-
-
-
-