-
NS Savannah
This ship weighed 320 tonnes and had a steam engine, paddlewheel and sails. This ship was also a hybrid ship. She was supported by government entities in the United States. Savannah was a demonstration project for nuclear energy's potential. The purpose of this project deliverable is the product being the steamship. This steamship was also the first steamship to cross the Atlantic ocean. The total cost of this project was $50,000 in 1819. (Savannah Ship Timeline., n.d.). -
The Electric Vehicle
This project was originally executed in 1832 becoming the most popular type of vehicle around due to the price of materials, however after world war's the price of materials increased making electric cars not popular. In 2008, these types of car's became popular again due to country's trying to become carbon free. -
Boeing 747
The purpose of this product is to create an innovative mode of transport. The Boeing 747 reduces air traffic by its convenient capacity to seat more passengers. Since its inception in 1969, the 747 has succeeded in delivering airline travel to an ever-increasing number of people while also lowering the cost of travel. The Boeing 747's design and manufacturing began in 1965. The main goal was to create an aeroplane that could transport more than twice as many people as any other aircraft -
Bike by Michael Kutter
- Michael Kutter manufactured first pedal-assist e-bikes (today known as PAS). Pedal assist bikes had no throttle and the motor turns on when the rider starts pedaling. Alas, his e-bikes were not popular on the market and Kutter went broke. His design was taken by Yamaha in 1993.
-
The channel tunnel
To build a train tunnel underneath the English channel to connect England to France so that materials and people could visit easily. The project was executed by the British and French governments. The purpose of the tunnel was to transport freight and people between the two countries easier. This is unique because building a tunnel underwater to connect the two counties is a once off occurrence and there would not be multiple tunnels beside each other
https://en.wikipedia.org/wiki/Channel_Tunnel -
Boring Company Tunnels
To build underground tunnels to reduce the traffic on roads in busy cities. The boring company is executing the project. This is a project because it consists of excavating and building tunnels and it is temporary because the tunnel in one location will only be built once even though the process will be used elsewhere the ground conditions might differ. This project is unique because tunnels usually go through a mountain but these tunnels go underground. https://www.boringcompany.com/projects