SYDNEY HABOUR BRIDGE

  • The state of the cpnsturction

    The state of the cpnsturction
    this was the start of the construction of the Sydney Harbour Bridge. That is so called "coathanger".
  • continuation of construction

    continuation of construction
    there was great excitement on 10 August 1930 after the arch was successfully joined at 10pm the night before. the steel decking was then hung from the arch and was all in place within nine month, being built from the center outwards to save time moving the cranes
  • project neared completion

    project neared completion
    As the project neared completion, the last of approXimately six million Australian made rivets were driven through the desk
  • bridge test

    bridge test
    the bridge was test loaded using up to 96 steam locomotives placed in various configurations
  • opening of the sydney harbour bridge

    opening of the sydney harbour bridge
    Sydney Harbour Bridge was open. this was a momentous occassion, drawing huge crowds (between 300. 000 and one mill. people). the NSW premier john lang, officially declare the Bridge open. However, Captain fracis de groot of the military group, the New guard, slashed the ribbon before him with a sword.
  • The celebration

    The celebration
    The opening celebrations included decorated floats, marching groups and band through the city streets. The celebratioms continued with a gun- salute, passenger ships under the Bridge, and a carnival