The project was commissioned in 1950 under Ceylon Electricity Board and the final installation has happened in1958. Since its the first hydro-electric power station in Sri Lanka, it is unique, Hydro-Electric Plant with 50MWe capacity, and the irrigation system was the outcome of this project. Furthermore, the installation of the power station took 8 years of temporary activity. https://en.wikipedia.org/wiki/Laxapana_Dam
-
The Dinorwig Power Station Plant, UK was opened by Prince Charles. The owner is the First Hydro Company (a division of Engie).
It is unique as it generated electricity by providing peak capacity with that of high energy storage. The outcome was that it could store cheap energy at low cost and reduced need to hold reserve on part loaded thermal plant.
https://www.power-technology.com/features/featuredinorwig-a-unique-power-plant-in-the-north-of-wales-5773187 -
Kakrapar Atomic Power Project is developed and executed by Nuclear power corporation of India. This Project is unique as first atomic power generation project in India. Project was temporary as started in 1993 and completed in 1995. The outcomes of unit I and Unit II were 440 MW electricity generation.
https://www.power-technology.com/projects/kakrapar-atomic-power-station-expansion/ -
Mundra power plant was developed by Adani group in kutch, Gujarat.. This project is unique because it is biggest thermal plant based with super critical technology in India. The project was fastest implemented power project in India as started in 2008 and completed in 2010 so it was completed in 36 months only. The outcomes of unit I and unit II were 660 MW electricity. https://www.adanipower.com/operational-power-plants/mundra-gujarat
-
The Desert sunlight project is a Photovoltaic solar generation plant that was executed by the California State government. the project delivers electricity for 160k houses in Riverside, California, and supports to displace 300k metric tons of carbon emission. That is the largest solar farm in the world therefore it's a unique activity and It's temporary because the project initiated in February 2011 and completed in January 2015. https://www.energy.gov/lpo/desert-sunlight
-
The Stortemelk hydro power plant can be stated as the greenfield project by REH project Development. In this concern the plant has been provided with the installed capacity of around 4.5 MW. The project was being structured as a unique project whereas temporary in nature because of its significant planning and outcomes that is achieved. The outcome was the contribution to South African power grid from a renewable resource and to local economy http://eigenbau.co.za/?project=stortemelk-hydro