nick yanez tx By gbarfield May 1, 2006 records May 16, 2006 bonded Jun 18, 2006 .016 NT; ref Upper 4s Jul 18, 2006 .018 NT U/L AWs; sep for banding w/ intention of TPA Jul 24, 2006 Bonded 7s for anchorage instead of TPA w/ intention of lacing and using Class 2 elastics Aug 18, 2006 .018 ss UA, 16x22 NT LA, class 1 retraction mechanics on U3s Sep 18, 2006 19x25 NT LA; cont class 1 mechanics on U3s, begin Class 2 elastics back up Oct 18, 2006 19x25 NT LA, cont both elastics on .018 ss UA Nov 18, 2006 retie both arches, cont both elastics (Cl1 plus Cl 2) Dec 18, 2006 beginning loss of post anchorage. d/c retraction. plan TADs Jan 18, 2007 bilat RMO dual tops btw U5/6 Jan 31, 2007 begin en masse retraction of U3-3 w/ c-chain tad to omegas on UAW Feb 18, 2007 increase UAW to 19x25 ss, cont class 1 retract and add class 2 vector Feb 18, 2007 U 5-5 pc for protract U5s. retie to TADs and U3s Mar 18, 2007 added class 1 elastic direct to U3s Apr 18, 2007 retie and cont all 3 elastics May 18, 2007 IPR lower arch; transfer records Jul 18, 2007 retie and correct LA rotations Aug 18, 2007 tied TADs to UAW and U5s to U3s Oct 18, 2007 retie UAW to TAD and U5s Nov 18, 2007 retied UAW to 5s and TADs. Start Class II again Dec 18, 2007 begin protraction of U5s Jan 18, 2008 tied TADs to U3s and U7s; cont Class 2; buttons U5s,U3s Feb 18, 2008 "edge to edge" reln. Begin Class III wear to protract U post and pc to U7s Feb 18, 2008 steel tie 6s to TADs, open coil 6-5 to mesialize 5s Mar 18, 2008 cont but add class 1 elastic to TADs from 3s Apr 18, 2008 retie, records May 18, 2008 noted reversing of upper arch levelling. D/c elastics, change UA to NT to relevel Jun 18, 2008 OJ decreased; cuspids nearly class 1; cont protraction of post