Construction

  • Sydney Harbour Bridge

    Sydney Harbour Bridge
    : the main purpose of the project is to create a bridge in the Dawes point area. The main rode have six lanes and to connect with the lanes this bridge has been created. The main road is 2.4km long. The composed arch 28 planes in each of the two archers, the height of the arch are 59ft. The weight of the bridge is around 52,800 tones long. The rivets used in the bridge are heated and have been inserted in the plates. The main purpose of the project is to build a bridge against momentum.
  • Karuah Bypass

    Karuah Bypass
    Karuah Bypass consist of 10.5km of four-lane median divided freeway along the town of Karuah. in Australia. The wetland and Karuah River bridge segments were built separately and assembled as one superstructure – on the mainland. This is the first project in that region to ever construct by using these kind of construction methods. completed on sep 2004, 3 month ahead of actual schedule, It reduces the travel distance, traffic and time to travel.
    Fixed: Time
    Optimize: Quality
    Accept: Cost
  • Wonderland Sydney

    Wonderland Sydney
    the main purpose of this project is to compete with other theme park located in Australia. This was a vast project which consist three theme parks in the wonderland. The theme parks are based on the hannabarbera show which needs a proper construction. The total area of the project is 219 hectares (pedestrian.tv, 2018). The total rides in the park are 24.the expansion of the wonderland has a water based theme park with various rides
  • Northern Gateway Toll Road

    Northern Gateway Toll Road
    Northern Gateway Toll Road, an extension of the Northern Motorway between Orewa and Puhoi, 30 km north of Auckland. It is first State Highway operating with toll gates, and the first road project in New Zealand to use artificial intelligence, which helps reducing its carbon footprint. The NGA project was completed on 25th January 2009. It’s a 7.5 km route that provides more direct journey between Auckland and North land.
    Fixed: Cost
    Optimize: Quality
    Accept: Time
  • Centenary Hospital for Women and Children

    Centenary Hospital for Women and Children
    Centenary Hospital for Women and Children is the first major extensive redevelopment of Canberra Hospital’s services, with over 140 beds, increased ambulatory care (outpatient) consult rooms, clinical office space, education and training facilities, family accommodation provided by Ronald McDonald House charities, a playground and landscaped spaces. They first commenced this project on September 2010 and completed all the 3 stages on December 2013.
    Fixed: Quality
    Optimize: Time
    Accept: Cost
  • Nyngan Solar Plant

     Nyngan Solar Plant
    the main purpose of this project is to construct the largest solar plant in the southern hemisphere. The main purpose of building this solar plant is to make the first solar plant, which can supply solar modules and can provide the post commissioning maintenance services for five years. The capacity of the plant is 155 megawatt. The main purpose of this project is to create a power source, which can become a renewable energy source. The expected generated electricity per year is 233,000MWh.
  • SCIRT - Stronger Christchurch Infrastructure Rebuild Team

    SCIRT - Stronger Christchurch Infrastructure Rebuild Team
    The objective of this project is to rebuild Christchurch’s horizontal infrastructure damaged in 2010 & 2011 quakes. This alliance project participants include the Christchurch City Council, CERA, NZTA, Fletcher, McConnell Dowell, Downer, City Care and Fulton Hogan. Project executed by Christchurch City Council;
    Total budget: NZ$2.2 B;
    Project completion date: March 2017. Fix: Quality;
    Optimise: Cost;
    Accept:Time.
  • The Waterview Tunnel

    The Waterview Tunnel
    The Waterview Tunnel connects SH20 and SH16 through an interchange in Auckland, which reduces the demand on SH1. Waterview tunnel is a twin tunnel each tunnel has three lanes. The tunnel is 2.4kms long. Project executed by NZTA;
    Total cost: NZ$1.4B;
    Project completion date: June 2017. Fix: Quality;
    Optimise: Cost;
    Accept:Time.
  • Earth quack National Memorial

    Earth quack National Memorial
    This project was built in the memory of the people who lost their lives in the earth quack of February 2011.it was planned by taking care of various aspects such as stakeholder analysis, time cost analysis, scope and risk and the most important is time limit.
    Fix: Cost
    Time: Optimize
    Quality: Accept
  • East Frame

    East Frame
    The purpose of the project is to provide the best facilities to the people of the Christchurch by adding more attractions to the central part of the city. There is a specific time to complete this project which is 2019 and the starting price of apartments available after completion of the project will be $360,000.
    Fix: Cost
    Time: Optimize
    Quality: Accept
  • Waikato Express Way

    Waikato Express Way
    The Waikato Expressway project will improve safety and reliability and reduce travel times and congestion on SH1 by delivering a four-lane highway from the Bombay Hills to south of Cambridge. The SH1 length will be reduced by 6kms once the new express way is completed and will reduce travel times between Auckland and Tirau by 35 minutes. Project executed by NZTA;
    Total cost: NZ$430M;
    Project completion date: December 2020. Fix: Quality;
    Optimise: Cost;
    Accept:Time.
  • Metro Sports Facility

    Metro Sports Facility
    The plan is to construct the metro sports facility for the people of the New Zealand which will contain so many facilities for the folks. There will be various steps in the plan such as Stakeholder analysis, Scope statement, Work break down structure, Ram and many more according to which each member of the team will work during the execution of the project. There is a specific timeline to complete the project to ensure its quality.
    Cost: Fix
    Time: Optimize
    Quality: Accept