Technology Strategy Timeline

  • Period: to

    Technology Strategy - Horizon 1

  • Period: to

    FY13 - Term 3

  • Network Change: Phase 1

    Network Change: Phase 1
    Part 1 of the 4 Part plan: Updating our wireless network:
    - rationalising the SSIDs
    - enabling Dual Band
    - Addressing controller contention issue (either bridging mode or flexi connect)
  • Period: to

    Networking Change Plan

  • iPad Strategy: CGS Protect POC

    iPad Strategy: CGS Protect POC
    The POC launch of CGS Protect
  • Network Change: Phase 2

    Network Change: Phase 2
    Migration to split network (Layer 3), separating Blue Zone from everything else. 802.11x Testing begins (POC)
  • Period: to

    FY13 - Term 4

  • Network Change: Phase 3

    Network Change: Phase 3
    Split out of Management zone, Orange and Red Zone (Layer 3). Complete ratioalising of servers.
    802.11x go Live
  • Network Change: Phase 4

    Network Change: Phase 4
    Separation and establishment of Guest network.
  • iPad Strategy: roll out to students

    iPad Strategy: roll out to students
    Distribution of iPads to students
  • Period: to

    Networking Uplift

    General improvements to Wireless Coverage and strength (Term holidays)
  • Period: to

    FY14 - Term 1

  • Cloud Migration: Potential Cut over to Telstra Man

    Cloud Migration: Potential Cut over to Telstra Man
    Aspirational date for moving away from ISnet over to Telstra Man
  • Cloud Migration: Potential Cut over to Cloud hosted infra

    Cloud Migration: Potential Cut over to Cloud hosted infra
    Aspirational date for cutover to virtual Data Centre
  • Period: to

    FY14 - Term 2

  • Period: to

    FY14 - Term 3

  • Period: to

    FY14 - Term 4