Parklane Landscaping Corporation - Stone Mountain HOA Front Entry Monument Revitalization Timeline
By Parklane
-
Removal of plant material (excluding large oaks and sculpted Pride of Houston Yaupon); Mid-sized oak tree at light pole to be removed; Removal of rocks (to be placed at side entrance to be repurposed by HOA); Removal of old irrigation system and parts; Careful conservation of electricity lines and main irrigation lines;
-
Removal of current sod (turf); removal excess soil (berms); Excavation/Preparation for installation of fresh nutrient-rich soil (4-6 inches deep)
-
Manicuring and pruning of the oak trees to allow for increased light and richer growth ( to include oak tree moss removal).
-
The board/landscape committee will review the final outline of the limestone border and approve the layout design before installation.
-
Installation of Nutrient-Rich Soil
-
Limestone curb to be installed per approval by board
-
Landscape irrigation installation per landscape planting plan.
-
Zoysia Turf Grass installation
-
Installation plant material at entry monument and spreading of mulch in design specified areas (entry bed and tree beds)