-
SWFWMD accepts 1.952 acre conservation easement from Lennar Homes/River Woods in exchange for wetlands developed by Lennar elsewhere in the RW development. Signed by John Sellinger (President of both Lennar Homes and RW HOA board). This mandates protection of the conservation easement property in perpetuity. Note: The easement lies between the purple line and the waters' edge.
-
Original community observation deck is built on Lennar property (2002-3).
-
Medallion purchases from Lennar the unfinished portion of River Woods phases III and IV (this includes property along the Manatee River). (Some time in 2003)
-
1 out of 5 docks now in place.
-
4 out of 5 docks now in place.
-
5 out of 5 docks now in place.
-
Medallion requests RW HOA to move the community observation deck from Medallion-owned property. The deck gets moved to the current location.
-
The pathway to the observation deck is in place. The walking path material is located partially within the conservation easement.
-
SWFWMD sends letter to RW HOA indicating multiple violations of the conservation easement. These include 5 docks, boardwalk, observation deck/path, and changes to rear-lot water conveyance that impinges on the easement.
-
SWFWMD agrees to an “after the fact” permit deal for RW to use the conservation easement. SWFWMD establishes the number of "mitigation bank credits" needed for this deal.
-
SWFWMD requires "Major Modification” to RW HOA’s original Environmental Resource Program (ERP) permit.
-
RW HOA submits Major Modification application for permit 6546.06 to SWFWMD.
-
SWFWMD approves 90 day extension to both RW HOA re major modification application, and to Medallion re mitigation credit transfer.
-
Anticipated permit modification approval by SWFWMD.