Production schedule

  • Pitch

  • Collect camera

    -Collect camera in order to film on Friday
  • Filming day 1

    -Film at Alexander Palace during lesson time
    -Location: Alexandra Palace Way, London N22 7AY
    -Mise-en-scene: urban streetwear sense, such as an oversized hoodie and jacket.
    -Equipment: Camera, Battery, Memory cards, Fig Rig
  • Filming day 2

    • Film at the Barbican within the lesson times -Location: Silk Street, London EC2Y 8DS
    • Mise-en-scene: Red lips, urban streetwear sense, such as an oversized hoodie and jacket. -Equipment: Camera, Battery, Memory cards, Fig Rig
  • Filming day 3

    Start filming at one of our furthest location which is Southbank.
    -Location: Belvedere Road, London SE1 8XX
    -Mise-en-scene: Red lips, urban streetwear sense, such as an oversized hoodie and jacket.
    -Equipment: Camera, Battery, Memory cards, Fig Rig
  • Filming Day 4

    Film at Alexander Palace during lesson time (Monday lesson)
    -Location: Alexandra Palace Way, London N22 7AY
    -Mise-en-scene: urban streetwear sense, such as an oversized hoodie and jacket.
    -Equipment: Camera, Battery, Memory cards, Fig Rig
  • Filiming day 5

    • Filming at Kings Cross station tunnel of lights
    • Mise-en-scene: (lights gallery) red lips, urban streetwear sense, In order to match the party / celebration vibe, the performer will also be wearing neon colours the props we will need is stuff like glow sticks etc.
    • Equipment: Camera, Battery, Memory card, Fig rig
  • Begin Editing

    -Start placing all of our footage together
  • Editing week 1

    -Start editing footage
    - Create a rough cut
  • Editing week 2

    -Continue with editing music video
    - Create a 2nd rough cut
  • Last week of editing

    • Start to finish editing
  • Music video deadline

    • Music video due in/deadline