Iowa City Renovations 2008-2013

By jslack
  • Chapter Structre: Alpha Chi Omega Soroity

    Chapter Structre: Alpha Chi Omega Soroity
    In the 2006 tornado that struck Iowa City, the Alpha Chi Omega chapter structure was demolished. The women of the chapter were forced to evacuate and reside in a temporary structure. Construction began for a new chapter structre, and the house was opened in 2008. More Alpha Chi Omega Info
  • Period: to

    Timeline of Iowa City Renovations

    This timeline shows some of the major construction and renovations that have occured starting in 2008.
  • Phase 1: Terry Trueblood Recreation Area

    Phase 1: Terry Trueblood Recreation Area
    Official Master PlanThe plans for the renovation of the Terry Trueblood Recreation Area begun in December 2009. Designers and park executives met and discussed potential improvements and models.
  • University of Iowa Recreation and Wellness Center

    University of Iowa Recreation and Wellness Center
    The new campus recreation center was opened on August 2nd, 2010. The center includes Olympic training pools, a rock climbing wall, running and biking equiptment with built-in video monitors, weight-lifting areas, a smoothie counter, and so much more. More Info on UI Recreation and Wellness
  • Phase 2: Terry Trueblood Recreation Area

    Phase 2: Terry Trueblood Recreation Area
    Official Master Plan4213 E. Sand Road
    Phase 2 of the renovations of the Terry Trueblood Recreation Area included a boat ramp, a parking ramp, restrooms, landscaping, sidewalks, and much more.
  • Washington Street Conversion

    Washington Street Conversion
    Beginning March 9th 2012, conversion of Washington Street began from a one-way street to a two-way street on the 100 and 200 blocks. This is the first time since 1976, when the street was originally converted to a one-way, that it has edured construction. Additional Info
  • Period: to

    Iowa City Renovations 2008-2013

  • Phase 3: Terry Trueblood Recration Area Renovation

    Phase 3: Terry Trueblood Recration Area Renovation
    4213 E. Sand Road
    Phase 3 of the renvoation of the Terrry Trueblood Recreation Area included trails, grading, a natural play area, parking, and, the main focus of the phose, the construction of the lodge and park shelters.
    Estimated cost: $2, 568, 170.00
  • UI Main Library Renovation

    UI Main Library Renovation
    The University of Iowa Main Libaray is being renovated beginning this summer. The renovations are in order to create a more comfortable, student-friendly atmosphere. Construction is predicted to last throughout Summer 2012. The library will remain closed for the summer.
  • Melrose Avenue Parking Ramp

    Melrose Avenue Parking Ramp
    Beginning in June, the houses located on Melrose Place, a street off of Melrose Avenue, will be demolished for construciton. The construciton will be a parking ramp for the UIHC.
  • Hancher Auditorium Replacement

    Hancher Auditorium Replacement
    In the 2008 flood, Hancher Auditorium was destroyed. This coming September, it will be replaced by a new Hancher, with an estimated construction cost of $119,544,880. More Information on Hancher Reconstruction
  • Phase 4: Terry Trueblood Recreation Area

    Phase 4: Terry Trueblood Recreation Area
    Official Master Plan Phase 4 of the renvoation of the Terry Trueblood Recreation Area includes utilities, a fishing jetty, a beach, and much more. The estimated cost of this phase is $2,195,875.00
  • School of Music Building

    School of Music Building
    he old School of Music building was destroyed in the 2008 flood, but the building will be rebuilt in September 2013 and is expected to be completed in August 2016. This will include new practce rooms, performance halls, adn so much more. More Information on Music Building Reconstruction