Unknown 2

Industry Project - Construction

  • St Basils Cathedral: The purpose is to celebrate military conquests
    1561

    St Basils Cathedral: The purpose is to celebrate military conquests

    St Basils Cathedral is an orthodox church based in Moscow Russia, ordered to be built by the prince of Russia (Ivan Vasilyevich) at the time. It was built to celebrate the military conquests over Russian states during his ruling. The project is temporary as it was started on 1555 and finished on 1561. Unique due to its appearance, colours and architectural style.
    The defined deliverable is the church. https://bit.ly/32yunoc
  • Auckland Sky Tower: The main purpose of the Sky Tower was to serve as a radio and telecommunications facility

    Auckland Sky Tower: The main purpose of the Sky Tower was to serve as a radio and telecommunications facility

    The sky tower is the tallest building in New Zealand which is located on Victoria Street in Auckland. Executed by Les Dykstra the construction began in 1994 and the temporary project finished in 1997. The project was temporary due to there being a start/finish date for when the construction began and ended. The project is unique because it serves as the worlds largest FM radio transmitter. The defined deliverable was the Auckland Sky Tower.
    https://bit.ly/2Ul0iUR
  • The Golden gate Bridge: The purpose of this was to shorten travel time between San Francisco and Marin Country.

    The Golden gate Bridge: The purpose of this was to shorten travel time between San Francisco and Marin Country.

    The Golden Gate Bridge is a suspension bridge spanning the Golden Gate. located in The project was executed by Joseph Strauss. The project is unique due to it being recognised as the tallest bridge in the world. The project is classed as temporary due to construction taking place from 1993-1997. The defined deliverable was the Golden Gate Bridge.
    https://cnn.it/36pOfLr
  • Marina Bay Sands – The purpose of this project was to build an integrated resort on the waterfront of the Marina Sands Reservoir in Singapore.

    Marina Bay Sands – The purpose of this project was to build an integrated resort on the waterfront of the Marina Sands Reservoir in Singapore.

    Safdie Architects designed and executed this project.
    This project is unique because of its complex design in architecture & engineering.
    This project is temporary because it was designed, constructed and opened in five years.
    The outcome of this project was three 55 story hotels, a 1.2 hectare Skypark, an Art-Science Museum, an event plaza, casino and shopping & dining outlets. https://bit.ly/32wJgHK
  • The Shard London: The purpose is accomodation and amenitys

    The Shard London: The purpose is accomodation and amenitys

    The Shard is a 95-storey skyscraper located in London developed by Sellar Property Group.
    The project is temporary as it was started on 2009 and finished on 2012.
    Unique due to its design and engineering.
    The defined deliverable is a building that compromises of accommodation, restaurants, shops and apartments. https://bit.ly/3lr5xyi
  • Forté Health: The purpose of this building is to provide private health care after the Christchurch earthquakes

    Forté Health: The purpose of this building is to provide private health care after the Christchurch earthquakes

    This project was executed by Fletchers Construction. It is unique because of the earthquake proof design of the hospital. It was temporary because it had an end date. The purpose of this project is to have a high-grade private hospital that can with stand major earthquakes.
    https://www.fletcherconstruction.co.nz/projects/healthcare/forte-health
  • Earthquake Memorial Wall: The purpose of this project is for people have a quiet place to grieve.

    Earthquake Memorial Wall: The purpose of this project is for people have a quiet place to grieve.

    This project is unique as it the biggest memorial in Christchurch, it is also temporary as it had an end date. The outcome is that people have a quiet place to grieve.
    https://www.fletcherconstruction.co.nz/projects/community/earthquake-memorial-wall
  • The purpose for constructing this building was because of the devastating earthquake that hit Christchurch and damaged the original emergency service buildings.

    The purpose for constructing this building was because of the devastating earthquake that hit Christchurch and damaged the original emergency service buildings.

    The Justice Precinct was executed by Fletcher Construction Company. This is a project because it is planned by the Ministry of Justice to be executed by The Fletcher Construction Company, it is unique as it is the biggest justice and emergency service facility that is in the same location in Australasia. This was a temporary project that started in July 2014 and ended in September 2017. Finally, the defined deliverable was the Christchurch Justice Precinct building. https://bit.ly/3eQdfiH
  • The purpose of the project deliverable was to redevelop part of the maximum-security prison in Auckland to an updated and modern version capable of protecting the prisoners, staff and the public.

    The purpose of the project deliverable was to redevelop part of the maximum-security prison in Auckland to an updated and modern version capable of protecting the prisoners, staff and the public.

    The Prison was executed by The Fletcher Construction Company. The Auckland Prison redevelopment was a project because it was planned by the Ministry of Corrections to be executed by The Fletcher Construction Company, it is unique as it is New Zealand’s biggest infrastructure project with special features to secure the prisoners. This was a temporary project that started in July 2014 and ended in June 2018. Finally, the defined deliverable was the Auckland Prison building. https://bit.ly/2JZsmex
  • Te Pae Christchurch Convention Centre – The purpose of this project is to keep people connected with each other, the region and the world.

    Te Pae Christchurch Convention Centre – The purpose of this project is to keep people connected with each other, the region and the world.

    Ōtākaro Limited is designing and constructing this project.
    This project is unique because it has been designed to reflect the heart & soul of Christchurch, inspired by the land and people.
    This project is temporary because there is an end date for the construction and the opening of this project in early 2021.
    The outcome of this project is a convention centre that will be able to hold up to 2,000 delegates, as well as many other meeting rooms and an exhibition hall. https://bit.ly/36v6zTB