Cvcc

CAD TIMELINE

  • Period: to

    CAD 2nd Quarter up to break

    Mr. Sommer's PageMr. Niinisto's PageAssignments up to Winter Break!
  • MONDAY! TURN IN MEASUREMENT HOMEWORK

    MONDAY!  TURN IN MEASUREMENT HOMEWORK
    See Mr. Sommer - Review events on timeline, and discuss procedure for dimensioning.
  • Cover Plate and Metal Gasket Due

    Cover Plate and Metal Gasket Due
    Turn in Metal Bracket if it is also done. Work on hand lettering at home if not yet completed.
  • A-12M/3 GUIDE BLOCK

    A-12M/3 GUIDE BLOCK
    Check with Mr. Sommer for next weeks assignment
  • HOUSE STYLE PROJECT DUE

    HOUSE STYLE PROJECT DUE
  • AUTOCAD 7271 SPECIAL KEY DUE

  • KITCHEN MEASUREMENTS

    KITCHEN MEASUREMENTS
    WORK ON OVER THANKSGIVING BREAK
  • IT FOR GIRLS

    IT FOR GIRLS
    COMPLETE SIMPLE KEY AND TEACH WITH STYLE
  • DRAWINGS DUE

    KITCHEN SKETCHES, CABINET ELEVATIONS, KITCHEN CAD DRAWING, 1269-1,1269-2,1269-3,1269-4,
  • START DRAWINGS

    START DRAWINGS
    7301,7302,7303,7304
  • CAD EXAM

    CAD EXAM
    EXAM DAY
  • NO SCHOOL

    NO SCHOOL
    NO SCHOOL
  • DRAWINGS DUE

    DRAWINGS DUE
    7301,7302,7303,7304
  • MODELS DUE

    MODELS DUE
    MODELS DUE
  • DRAWINGS 652 1-3 DUE

    SKETCHES AND CAD DRAWINGS ARE DUE
  • IX FIELD TRIP

    IX FIELD TRIP
    GARDEN AND HOUSING
  • Drawings 6.55, 6.56, 6.57. due

    Drawings 6.55, 6.56, 6.57. due
    see page 184, ask Mr. Niinisto if unsure., FINISHING 6.55
  • 7-32,33,34 DUE

    7-32,33,34 DUE
    DUE DATE
  • FIND ITEM AT HOME to bring in tomorrow, FRIDAY!!!

    Item must have at least 3 parts (like the tape dispenser Mr. Sommer showed). Pick something simple to draw. If it has too many small part it will be difficult to measure. The tape dispenser was probably a good type of item.
  • Give Mr. N item from home! COMPLETE MANUAL DRAWINGS

    Give Mr. N item from home!  COMPLETE MANUAL DRAWINGS
    BE CLEAR ON ASSIGNMENT FOR NEXT WEEK, give Mr. N item from home for approval.
  • REVERSE ENGINEERING DRAWING DUE FRIDAY

    REVERSE ENGINEERING DRAWING DUE FRIDAY
    TURN IN DRAWING ON FRIDAY
  • TURN IN CERTIPORT FORM

    TURN IN CERTIPORT FORM
    GET CERTIPORT FORM SIGNED AND TURNED IN
  • SOLIDWORKS

    SOLIDWORKS
    WORK ON ASSIGNED DRAWINGS
  • CONTINUE ON GEARBOX IN SOLIDWORKS FOR REMAINDER OF THIS QUARTER

    CONTINUE ON GEARBOX IN SOLIDWORKS FOR REMAINDER OF THIS QUARTER
  • TURN IN SKETCH AND PROGRESS REPORT

    TURN IN SKETCH AND PROGRESS REPORT
  • WORK ON POSTER

    WORK ON POSTER
  • IN CLASS ASSIGNMENT WITH SUB

    IN CLASS ASSIGNMENT WITH SUB
  • FINISH POSTER

    FINISH POSTER
  • PICK UP ON AUTOCAD WHERE CLASS IS AT

    PICK UP ON AUTOCAD WHERE CLASS IS AT
  • PRINT OUT POSTER

  • START 11.2.9 SCREW THREADS

    START 11.2.9 SCREW THREADS
    SQUARE HEAD FASTENER, ACME HEAD FASTENER
  • SEE MR. NIINISTO FOR ASSIGNMENTS AND DEADLINES

    SEE MR. NIINISTO FOR ASSIGNMENTS AND DEADLINES
    IF NOT COMPLETE GET CONFIRMATION BEFORE SWITCHING ASSIGNMENTS