-
Construction begins on the Golden Gate Bridge.
-
Golden Gate Bridge opening day festival.
-
Created due to the extra $1.3 million left over from the bridge construstion. Designed by Alfred Finnila and includes a diner and is the unofficial gift shop of the bridge.
-
Railings were added to keep pedestrians and cyclists from falling into the oncoming traffic.
-
Doyle Drive replacement begins. Temporarily known as Presidio Parkway.
-
Planned for 2014 is the movable median barrier, planned to reduce head on collisions on the bridge.