  • Plant 0 in La Treinta y Cuatro.

  • Plant 1 at Ojojona.

    Plant 1 at Ojojona.
    Inauguration of the first AguaClara designed plant at Ojojona.
  • Plant 2 at Tamara

    Plant 2 at Tamara
    1.First Linear Flow Orifice Meter installed. 2.Major improvements to the sedimentation tank. 3.First filter installed.
  • Plant 3 at Marcala

    Plant 3 at Marcala
    Plant 3 in the community of Marcala is inaugurated. Used ferrocement baffles.
  • Plant 4 at Cuatro

    Plant 4 at Cuatro
    1.Innovations in the Chemical Dosing System
    2.New Sedimentation Tank geometry.
    3.Altered Flocculator results
  • Plant 5 at Agalteca

    Sedimentation inlet system altered.
  • The expansion of Plant 3 at Marcala

    The expansion of Plant 3 at Marcala
  • Plant 6 at Alauca

    Altered geometry of Sedimentation Tank
  • Plant 7 at Atima

    Improved sedimentation tank design
    Altered Chemical Dosing System
  • Plant 8 at San Nicolas

    1.Dual Chemical Dosing System implemented
    2.Sedimentation Tank altered.
    3.First Filter integrated into the design.
    4. First plant to have a ram pump.
  • Plant 9 at Jesus de Otoro

  • Plant 10 at Moroceli

    Plant 10 at Moroceli
  • Plant 11 at San Matias

    1.First and only entrance tank reservoir built.
    2.Sedimentation Tank drain simplified.
    3. New filter inlet design.
  • Plant 12 at San Juan Guarita

  • 1 L/s plant succeeded!!!

    1 L/s plant succeeded!!!
  • Plant 13 at Las Vegas

    Plant 13 at Las Vegas
    First plant to prevent scaling by dosing acid.