-
Project Estimate Cost is $3,70,000.
-
India’s first solar boat was launched in Kerala,Kochi. The main aim of the project is to the replacement of diesel boats to solar-powered boats.Solar boats can operates with less cost and fuel efficiency.This solar boat can produce 2.25 MW using the energy resources.Capacity is about a 75 seater boat.Solar boat operates
with minimum vibration compared to diesel ferries.Various trials like optimization,builders and site trials are conducted before the project.
Want to make a timeline like this?
Use Timetoast to turn dates, events, milestones, and phases into a clear visual timeline you can build and share. Timetoast is a timeline maker for work, school, research, and stories.