Arriving: Robert Cabana, Rick Sturckow, Nancy Currie, Jerry Ross, James Newman, Sergei Krikalev
-
Connected computer cables between Unity, PMA-1, PMA-2 and Zarya.
-
Installed antennas on Unity. Part of early S-band system.
-
Checked insulation cover on cable connector on PMA-2, attached EVA tools to PMA-1, inspected Orbiter Space Vision System targets on Unity.
-
Departing: Robert Cabana, Rick Sturckow, Nancy Currie, Jerry Ross, James Newman, Sergei Krikalev
-
Arriving: Kent Rominger, Rick Husband, Tamara Jernigan, Ellen Ochoa, Daniel Barry, Julie Payette, Valery Tokarev
-
Installed two cranes on station exterior, installed two portable foot restraints, attached bags of tools and handrails for future EVAs.
-
Departing: Kent Rominger, Rick Husband, Tamara Jernigan, Ellen Ochoa, Daniel Barry, Julie Payette, Valery Tokarev
-
Arriving: James Halsell, Scott Horowitz, Mary Weber, Jeff Williams, James Voss, Susan Helms, Yury Usachev
-
Inspected Orbital Replacement Unit Transfer Device, completed assembly of Strela crane, replaced one comm antenna on Unity.
-
Departing: James Halsell, Scott Horowitz, Mary Weber, Jeff Williams, James Voss, Susan Helms, Yury Usachev
-
-
-
-
Arriving: Terrence Wilcutt, Scott Altman, Ed Lu, Rick Mastracchio, Dan Burbank, Yuri Malenchenko, Boris, Morukov
-
Attached cabling between Zvezda and rest of station, constructed and attached magnetometer as backup nav system.
-
Departing: Terrence Wilcutt, Scott Altman, Ed Lu, Rick Mastracchio, Dan Burbank, Yuri Malenchenko, Boris, Morukov
-
Arriving: Brian Duffy, Pamela Melroy, Leroy Chiao, William McArthur, Peter Wisoff, Michael Lopez-Alegria, Koichi Wakata
-
Connected heater cables to the Z1 truss, relocated two comm assemblys, installed a toolbox for future use.
-
Installed PMA-3 to the nadir port of Unity, prepared Z1 for solar array installation.
-
Installed two DC-to-DC converter units atop Z1.
-
Removed grapple fixture from Z1, deployed Z1 utility tray, cycled and opened Manual Berthing Mechanism latches, demonstrated SAFER pack abilities.
-
Departing: Brian Duffy, Pamela Melroy, Leroy Chiao, William McArthur, Peter Wisoff, Michael Lopez-Alegria, Koichi Wakata
-
-
Arriving: William Shepherd, Sergei Krikalev, Yuri Gidzenko
-
-
-
Arriving: Brent Jett, Michael Bloomfield, Joe Tanner, Marc Garneau, Carlos Noriega
-
Attached the P6 truss to the Z1, prepared solar arrays for deployment, prepared radiator for power system deployment
-
Configured station to use power from P6, position S-band antenna for use, prepared station for arrival of Destiny
-
Positioned probe to measure plasma field surrounding station, increased tension in starboard solar array blankets, installed centerline camera cable outside Unity
-
Departing: Brent Jett, Michael Bloomfield, Joe Tanner, Marc Garneau, Carlos Noriega
-
-
-
Arriving: Kenneth Cockrell, Mark Polansky, Robert Curbeam, Marsha Ivins, Thomas Jones
-
-
Removed launch covers and power and cooling cables between Destiny and Atlantis, connected electrical, data and colling lines between Destiny and Unity
-
-
Installed PMA-2 to Destiny, installed insulating covers over pins that held Destiny in orbiter payload bay, attached vent to Destiny’s air system, installed handrails and sockets on exterior, attached base for robotic arm
-
-
Attached spare comm antenna, double-checked connections between Destiny and Unity, released cooling radiator on P6, inspected solar array connections, tested EVA rescue procedures
-
-
-
-
Arriving: Yury Usachev, Susan Helms, James Voss, James Wetherbee, James Kelly, Paul Richards, Andrew Thomas
-
Prepared PMA-3 for relocation to port side of Unity, installed Lab Cradle Assembly and cable tray outside Destiny.
-
-
Attached External Stowage Platform with spare ammonia coolant pump, finished instaling connector cables for robotic arm, inspected a Unity heater connection, inspected the Floating Potential Probe
-
Departing: William Shepherd, Sergei Krikalev, Yuri Gidzenko, James Wetherbee, James Kelly, Paul Richards, Andrew Thomas
-
-
-
Arriving: Kent Rominger, Jeff Ashby, Chris Hadfield, John Phillip, Scott Parazynski, Umberto Guidoni, Yuri Lonchakov
-
Installed UHF antenna and Canadarm2, connected power and data cables to the arm.
-
-
Connected Power and Data Grapple Fixture circuits or Canadarm2 onto Destiny, removed early comm antenna, stored spare Direct Current Switching Unit to storage rack outside Destiny
-
Departing: Rominger, Jeff Ashby, Chris Hadfield, John Phillip, Scott Parazynski, Umberto Guidoni, Yuri Lonchakov
-
Arriving: Talgat Musabayev, Yuri Baturin, Dennis Tito
-
Departing: Talgat Musabayev, Yuri Baturin, Dennis Tito
-
-
Installed docking cone onto nadir port of Zarya, in preparation for arrival of Pirs
-
Arriving: Steve Lindsey, Charlie Hobaugh, Michael Gernhardt, Janet Kavandi, James Reilly
-
Installed Quest to starboard side of Unity.
-
-
Installed high-pressure nitrogen tank and high-pressure oxygen tank onto Quest, installed grapple fixture and trunion covers
-
Installed second high-pressure nitrogen tank and high-pressure oxygen tank onto Quest
-
Departing: Steve Lindsey, Charlie Hobaugh, Michael Gernhardt, Janet Kavandi, James Reilly
-
Arriving: Frank Culbertson, Mikhail Tyurin, Vladimir Dezhurov, Scott Horowitz, Rick Sturckow, Daniel Barry, Patrick Forrester
-
Installed Early Ammonia Servicer onto P6, stowed a foot restraint and installed Materials International Space Station Experiment-1 and -2 containers onto Quest
-
Installed heater cables and handrails onto Destiny
-
Departing: Yury Usachev, Susan Helms, James Voss, Scott Horowitz, Rick Sturckow, Daniel Barry, Patrick Forrester
-
-
-
-
-
-
Installed comm cables between Pirs and Zvezda, installed handrails and exterior ladder on Pirs, installed Strela cargo crane
-
Installed MPAC-SEEDS experiment onto Pirs
-
-
Arriving: Viktor Afanasyev, Claudie Haigneré, Konstantin Kozeyev
-
Departing: Viktor Afanasyev, Claudie Haigneré, Konstantin Kozeyev
-
Connected Kurs cables to Pirs, completed Strela checks, inspected Zvezda solar array
-
-
-
Removed obstruction from Zvezda docking interface to allow Progress docking
-
Arriving: Yury Onufrienko, Daniel Bursch, Carl Walz, Dominic Gorie, Mark Kelly, Linda Godwin, Dan Tani
-
Installed insulation blankets around two Beta Gimbal Assemblies and performed get-ahead tasks for STS-110
-
Departing: Frank Culbertson, Mikhail Tyurin, Vladimir Dezhurov, Dominic Gorie, Mark Kelly, Linda Godwin, Dan Tani
-
Moved Strela cargo boom from PMA-1 to Pirs, installed amateur radio antenna on Zvezda
-
Installed deflector shields for Zvezda’s thrusters, amateur radio antenna on Zvezda, attached science experiments, replaced device to measure material output from thrusters
-
Tested and prepared Quest for STS-110 EVAs
-
-
-
Arriving: Michael Bloomfield, Steve Frick, Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin, Rex Walheim
-
Began installation of S0 truss onto Destiny, installed initial power and data connectors and two forward struts between truss and station
-
Continued S0 installation, connected power and data cables and two aft struts between truss and station
-
Released initial attachment claw between S0 and station, installed power cables for Canadarm2 on truss, released mobile transporter launch restraints, removed thermal cover from transporters radiator
-
Pivoted airlock spur, installed handrails on S0, partially assembled platform, installed floodlights
-
Departing: Michael Bloomfield, Steve Frick, Jerry Ross, Steven Smith, Ellen Ochoa, Lee Morin, Rex Walheim
-
-
Arriving: Yuri Gidzenko, Roberto Vittori, Mark Shuttleworth
-
Departing: Yuri Gidzenko, Roberto Vittori, Mark Shuttleworth
-
Arriving: Valery Korzun, Peggy Whitson, Sergei Treschev, Kenneth Cockrell, Paul Lockhart, Franklin Chang-Diaz, Philippe Perrin
-
Attached Power and Data Grapple Fixture to P6, temporarily attached debris panels to PMA-1, removed thermal blankets from Mobile Base System
-
Attached Mobile Base System to Mobile Transporter, attached power, data and video cables to MBS
-
Replaced wrist roll joint of Canadarm2
-
Departing: Yury Onufrienko, Daniel Bursch, Carl Walz, Kenneth Cockrell, Paul Lockhart, Franklin Chang-Diaz, Philippe Perrin
-
-
-
Installed micrometeoroid debris panels on Zvezda
-
Installed frame outside Zarya for assembly tasks, installed new samples on JAXA experiment outside Zvezda, installed tether routers and two ham radio antennas outside Zvezda
-
-
-
Arriving: Jeff Ashby, Pamela Melroy, David Wolf, Sandra Magnus, Piers Sellers, Fyodor Yurchikhin
-
Released launch locks from S1 truss radiators, attached power, data and fluid lines between S0 and S1, deployed second S-band comm system, installed external camera system, released launch locks from Cre and Equipment Translation Aid
-
Installed second external camera system, released radiator launch locks, removed insulation covers from quick-disconnect fittings near Z1/P6 junction, installed Spool Positioning Devices, released starboard launch restraint on CETA cart, attached Ammonia Tank Assembly cables
-
Replaced Interface Umbilical Assembly on Mobile Transporter, installed ammonia flow jumpers between S1 and S0, released and stowed drag link, installed Spool Positioning Devices
-
Departing: Jeff Ashby, Pamela Melroy, David Wolf, Sandra Magnus, Piers Sellers, Fyodor Yurchikhin
-
Arriving: Sergei Zalyotin, Frank De Winne, Yuri Lonchakov
-
Departing: Sergei Zalyotin, Frank De Winne, Yuri Lonchakov
-
Arriving: Kenneth Bowersox, Nikolai Budarin, Donal Pettit, James Wetherbee, Paul Lockhart, Michael Lopez-Alegria, John Herrington
-
Initial installation of P1 truss, installed connections between P1 and S0, installed Spool Positioning Devices, removed drag link from P1, installed Wireless video system External Transceiver Assembly onto Unity
-
Installed fluid jumpers between S0 and P1, removed starboard keel pin from P1, installed Wireless video system External Transceiver Assembly onto P1, relocated CETA cart from P1 to S1
-
Installed Spool Positioning Devices, reconfigured Main Bus Switching Units electrical harnesses, attached Ammonia Tank Assembly lines
-
Departing: Valery Korzun, Peggy Whitson, Sergei Treschev, James Wetherbee, Paul Lockhart, Michael Lopez-Alegria, John Herrington
-
Released launch locks on P1 radiators, removed debris from Unity docking port, tested ammonia reservoir on P6
-
-
-
Reconfigured cables on S0, S1 and P1, replaced Power Control Module on Mobile Transporter, installed Spool Positioning Devices on Destiny, reinstalled thermal cover on S1 Radiator Beam Valve Module
-
Arriving: Yuri Malenchenko, Ed Lu
-
Departing: Kenneth Bowersox, Nikolai Budarin, Donal Pettit
-
-
-
-
Arriving: Michael Foale, Alexander Kaleri, Pedro Duque
-
Departing: Yuri Malenchenko, Ed Lu, Pedro Duque
-
-
-
Replaced experiment sample containers, attached Matryoskha experiment to Zvezda, removed JAXA micro-meteor experiment
-
Arriving: Gennady Padalka, Michael Fincke, André Kuipers
-
Departing: Michael Foale, Alexander Kaleri, André Kuipers
-
-
-
EVA cut short after 14 minutes
-
Replaced Remote Power Controller from Control Moment Gyroscope 2
-
-
Installed laser retro reflectors and an internal videometer target on Zvezda, installed two antennas, replaced Kromka experiment packages
-
-
Replaced Zarya Control Module flow control panel, installed safety tether leads on Zarya handrails, installed comm antennas, removed covers from antennas
-
Arriving: Leroy Chiao, Salizhan Sharipov, Yuri Shargin
-
Departing: Gennady Padalka, Michael Fincke, Yuri Shargin
-
-
-
-
Completed installation of Universal Work Platform, mounted Rokviss experiment, installed Biorisk experiment, relocated exposure experiment
-
-
-
Installed nav and comm equipment for use with ATV, deployed nanosatellite
-
Arriving: Sergei Krikalev, John Phillips, Roberto Vittori
-
Departing: Leroy Chiao, Salizhan Sharipov, Roberto Vittori
-
-
-
-
Arriving: Eileen Collins, James Kelly, Soichi Noguchi, Stephen Robinson, Andrew Thomas, Wendy Lawrence, Charles Camarda
-
Demonstrated enhancements to station attitude control system and shuttle repair techniques, installed base and cabling for External Stowage Platform, rerouted power to Control Moment Gyroscope 2, retrieved two exposure experiments, replaced faulty GPS antenna
-
Replaced CMG-1 on Z1
-
Installed amateur radio satellite PCSAT2, repaired shuttle heat shield
-
Departing: Eileen Collins, James Kelly, Soichi Noguchi, Stephen Robinson, Andrew Thomas, Wendy Lawrence, Charles Camarda
-
Retrieved a Biorisk canister, removed MPC and SEED experiments from Zvezda, retrieved Matroshka experiment, installed ATV docking camera
-
-
-
Arriving: William McArthur, Valery Tokarev, Gregory Olsen
-
Departing: Sergei Krikalev, John Phillips, Gregory Olsen
-
Installed P1 camera, retrieved failed Rotary Joint Motor Controller, jettisoned Floating Potential Probe, replaced remote power controller module on Mobile Transporter
-
-
-
Released SuitSat-1, retrieved Biorisk, photographed sensor for micrometeoroid experiment, relocated adapter for small crane, tied off Mobile Transporter umbilical
-
-
-
Arriving: Pavel Vinogradov, Jeff Williams, Marcos Pontes
-
Departing: William McArthur, Valery Tokarev, Marcos Pontes
-
-
Repaired Elektron vent, retrieved Biorisk, retrieved contamination-measuring device from Zvezda, replaced camera on Mobile Base System
-
-
-
Arriving: Thomas Reiter, Steve Lindsey, Mark Kelly, Michael Fossum, Lisa Nowak, Stephanie Wilson, Piers Sellers
-
Installed blade blocker in zenith Interface Umbilical Assembly, rerouted damaged power, video and data cable, tested Orbiter Boom Sensor System as work platform
-
Restored Mobile Transporter rail car to full operation, installed spare pump module
-
Departing: Steve Lindsey, Mark Kelly, Michael Fossum, Lisa Nowak, Stephanie Wilson, Piers Sellers
-
Installed Floating Potential Measurement Unit, two materials in MISSE containers, thermal radiator rotary joint controller, jumper and spool positioning device on S1, light on the truss rail cart, replaced GPS antenna, inspected scratch on Quest
-
Arriving: Brent Jett, Christopher Ferguson, Steven MacLean, Dan Burbank, Heidemarie Stefanyshyn-Piper, Joe Tanner
-
Installed P3/P4 truss, connected power cables, released launch restraints on solar array blanket box, Beta Gimbal Assembly and solar array wings, configured Solar Alpha Rotary Joint, removed two circuit interrupt device in prep for STS-116
-
Continued installation of P3/P4, activated SARJ
-
Installed radiator on P3/P4, powered up cooling radiator, replaced S-band radio antenna, installed insulation for another antenna.
-
Departing: Brent Jett, Christopher Ferguson, Steven MacLean, Dan Burbank, Heidemarie Stefanyshyn-Piper, Joe Tanner
-
-
-
Arriving: Michael Lopez-Alegria, Mikhail Tyurin, Anousheh Ansari
-
Departing: Pavel Vinogradov, Jeff Williams, Anousheh Ansari
-
-
-
Inspected Kurs antenna on docked Progress 23, relocated ATV WAL antenna, installed BTN neutron experiment, jettisoned two thermal covers from BTN
-
Arriving: Sunita Williams, Mark Polansky, Bill Oefelein, Nicholas Patrick, Robert Curbeam, Christer Fuglesang, Joan Higginbotham
-
Installed P5 truss, replaced video camera on S1, prepared P5 for relocation of P6
-
Reconfigured station’s electrical wiring, placed channels 2-3 on P3/P4 into service, relocated two rail hand carts, installed thermal cover on Canadarm2, installed tool bags for future EVAs
-
Completed rewiring of electrical system, activated circuits 1 and 4, installed robotic arm grapple fixture, positioned three debris panel bundles outside Zvezda, assisted retraction of P6 solar array
-
Assisted with retraction of P6 solar arrays
-
Departing: Thomas Reiter, Mark Polansky, Bill Oefelein, Nicholas Patrick, Robert Curbeam, Christer Fuglesang, Joan Higginbotham
-
-
-
Reconfigured two Destiny cooling loops to permanent system, connected Station-to-Shuttle Power Transfer System, installed cable cinches and winch bars to secure P6 starboard radiator, installed shroud over it, removed Early Ammonia Servicer fluid line on P6
-
Reconfigured Destiny cooling loop to permanent system, completed EAS work on P6, photographed inboard end of P6 solar wing in prep for retraction, removed sunshade from multiplexer-demultiplexer data relay device, continued SSPTS work
-
Removed thermal shrouds from Rotary Joint Motor Controllers on P3, removed shrouds from P3 bays 18 and 20 and jettisoned them, deployed Unpressurised Cargo Carrier Assembly Attachment System on P3, removed launch locks from P5, connected four SSPTS cables to PMA-2
-
Retracted Progress antenna, photographed sat nav antenna on Zvezda, replaced materials experiment, inspected ATV antenna, photographed robotics experiment, inspected, remated and photographed hardware connectors
-
-
Arriving: Fyodor Yurchikhin, Oleg Kotov, Charles Simonyi
-
Departing: Michael Lopez-Alegria, Mikhail Tyurin, Charles Simonyi
-
-
Installed Service Module Debris Protection panels on Zvezda, rerouted GPS antenna cable
-
Installed Ethernet cable on Zarya, installed SMDB panels on Zvezda, deployed scientific experiment
-
Arriving: Clayton Anderson, Rick Sturckow, Lee Archambault, Patrick Forrester, Steven Swanson, John Olivas, James Reilly
-
Completed installation of S3/S4, attached bolts, cables and connectors, released launch restraints on solar array blanket boxes
-
Assisted in retraction of P6 solar arrays, attempted installation of drive-lock assembly, S3/S4 launch restraints left in place to prevent undesired rotation due to reverse wiring
-
Computer failure leaves station without thrusters, oxygen generators, carbon dioxide scrubbers. Computer restart causes false fire alarm.
-
Finished P6 solar array retraction, installed hydrogen ventilation valve onto Destiny
-
-
-
Retreived tv camera and support structure from Extrernal Stowage Platform attached to Quest, installed it on S3, verified Drive Lock Assembly 2 configuration, removed last six SARJ launch restraints, installed computer network cable on Unity, opened hydrogen vent valve on Destiny, tethered two orbital debris panels to Zvezda
-
Departing: Sunita Williams, Rick Sturckow, Lee Archambault, Patrick Forrester, Steven Swanson, John Olivas, James Reilly
-
Replaced components of Mobile Transporter redundant power system, jettisoned ammonia tank and flight support equipment, cleaned nadir Common Berthing Mechanism of Unity
-
-
-
Arriving: Scott Kelly, Charlie Hobaugh, Tracy Caldwell, Rick Mastracchio, Dafydd Williams, Barbara Morgan, Alvin Drew
-
Attached S5 truss, retracted forward radiator of P6
-
Installed new CMG onto Z1, removed failed CMG to External Stowage Platform 2
-
Moved two CETA carts to the right of the Mobile Transporter, relocated antenna base from P6 to P1, installed new S-band transponder and signal processor
-
Retrieved MISSE containers 3 and 4, installed OBSS Boom Stand, installed External Wireless Instrumentation System antenna, secured Z1 gimbal locks
-
Departing: Scott Kelly, Charlie Hobaugh, Tracy Caldwell, Rick Mastracchio, Dafydd Williams, Barbara Morgan, Alvin Drew
-
-
Arriving: Yuri Malenchenko, Peggy Whitson, Sheikh Muszaphar Shukor
-
Departing: Fyodor Yurchikhin, Oleg Kotov, Sheikh Muszaphar Shukor
-
Arriving Daniel Tani, Pamela Melroy, George Zamka, Scott Parazynski, Stephanie Wilson, Doug Wheelock, Paolo Nespoli
-
Installed Harmony on the port side of Unity, retrieved S-Band Antenna Support Assembly, disconnected fluid lines on P6 and Z1
-
-
Disconnected Z1-to-P6 umbilicals, detached P6 from Z1, configured S1 radiator, installed handrails onto Harmony, inspected S4 starboard SARJ
-
Attached P6 to P5, installed P6/P5 umbilicals, reconfigured S1, inspected port SARJ
-
-
Inspected and repaired P6 solar array
-
Departing: Clayton Anderson, Pamela Melroy, George Zamka, Scott Parazynski, Stephanie Wilson, Doug Wheelock, Paolo Nespoli
-
Disconnecte and stored SSPTS cables, stored PMA-2 umbilical, stored Harmony avionics umbilicals in temporary position
-
-
-
Started external configuration of PMA-2 and Harmony, attached fluid, electrical and data lines, hooked up avionics lines, attached heater cables, relocated fluid tray
-
Completed attachment of fluid, electrical and data lines on PMA-2 and Harmony, attached Loop B Fluid Tray to port side of Destiny, inspected and photographed starboard SARJ
-
Inspected S4 starboard SARJ and a Beta Gimbal Assembly
-
-
-
Replaced Bearing Motor Roll Ring Module, inspected starboard SARJ
-
-
-
Arriving: Léopold Eyharts, Steve Frick, Alan Poindexter, Leland Melvin, Rex Walheim, Hans Schlegel, Stan Love
-
Installed grapple fixture on Columbus, prepared electrical and data connections, moved P1 nitrogen tank
-
-
Installed new P1 nitrogen tank, completed routing for SSPTS
-
Installed the SOLAR telescope and EuTEF facility onto Columbus, removed failed CMG, installed keel pin cloth covers on Columbus
-
Departing: Daniel Tani, Steve Frick, Alan Poindexter, Leland Melvin, Rex Walheim, Hans Schlegel, Stan Love
-
Arriving: Garrett Reisman, Dom Gorie, Gregory Johnson, Robert Behnken, Mike Foreman, Richard Linnehan, Takao Doi
-
Installed the Kibo ELM-PS at the zenith port of Harmony, began assembly of Dextre
-
-
Continued assembly of Dextre
-
Completed assembly of Dextre, installed spare equipment onto an ESP at Quest, attempted to attach MISSE 6 to Columbus
-
Replaced Remote Power Control module, removed cover from left arm of Dextre, removed launch locks from Harmony, released launch locks on Harmony’s port and nadir CBMs
-
Completed storage of OBSS, insatlled ELM-PS trunnion covers, removed five covers from starboard SARJ and performed inspections, installed MISSE 6 onto Columbus
-
Departing: Léopold Eyharts, Dom Gorie, Gregory Johnson, Robert Behnken, Mike Foreman, Richard Linnehan, Takao Doi
-
-
-
Arriving: Sergey Volkov, Oleg Kononenko, Yi So-yeon
-
Departing: Peggy Whitson, Yuri Malenchenko, Yi So-yeon
-
-
Arriving: Gregory Chamitoff, Mark Kelly, Ken Ham, Karen Nyberg, Ron Garan, Mike Fossum, Akihiko Hoshide
-
Transferred OBSS back to shuttle, prepared Kibo PM for installation, replaced trundle bearing assembly on the starboard SARJ, inspected SARJ damage
-
-
Installed covers and external tv equipment on Kibo, prepared the ELM-PS for relocation, prepared depleted nitrogen tank assembly for removal, removed failed camera.
-
-
Replaced starboard nitrogen tank assembly, finished outfitting of Kibo, reinstalled repaired camera
-
Departing: Garrett Reisman, Mark Kelly, Ken Ham, Karen Nyberg, Ron Garan, Mike Fossum, Akihiko Hoshide
-
Removed pyrotechnic bolt from docked Soyuz for testing
-
Installed docking target on Zvezda, installed Vsplesk experiment, straightened ham radio antenna, retrieved Biorisk
-
-
-
-
Arriving: Michael Fincke, Yuri Lonchakov, Richard Garriott
-
Departing: Sergey Volkov, Oleg Kononenko, Richard Garriott
-
-
Arriving: Sandra Magnus, Chris Ferguson, Eric Boe, Donald Pettit, Stephen Bowen, Heidemarie Stefanyshyn-Piper, Robert Kimbrough
-
Transferred empty nitrogen tank assembly from ESP3 to shuttle, installed flex hose rotary coupler on ESP3, removed insulation cover from Kibo berthing mechanism, claned and lubricated starboard SARJ, replaced SARJ trundle bearing assemblies
-
Relocated two CETA carts to port side of Mobile Transporter, lubricated Canadarm2’s latching end effector, continued SARJ cleaning and lubrication
-
Continued cleaning and lubrication of SARJ
-
Completed raplacement of SARJ trundle bearings, lubricated port SARJ, installed video camera, reinstalled insulation covers on Kibo berthing mechanism, performed grounding tab maintenance on Kibo arm, installed handrails and GPS antennas on Kibo, photographed radiators and trailing umbilical system cables
-
Departing: Gregory Chamitoff, Chris Ferguson, Eric Boe, Donald Pettit, Stephen Bowen, Heidemarie Stefanyshyn-Piper, Robert Kimbrough
-
-
Installed Langmuir probe on Pirs, removed Biorisk, installed Expose-R experiment package on Zvezda, installed Impulse experiment
-
-
-
-
Installed Expose-R on Zvezda, removed tape straps from Pirs docking target, inspected and photographed Russian section
-
Arriving: Koichi Wakata, Lee Archambault, Tony Antonelli, Joseph Acaba, Stephen Swanson, Richard Arnold, John Phillips
-
Installed S6 truss, connected S5/S6 umbilicals, released launch restraints, removed keel pins, removed thermal covers, deployed S6 radiator
-
Prepared work site for STS-127, installed cargo carrier attachment system onto P3, installed GPS antenna to Kibo, took infrared images of P1 and S1 radiator panels
-
Relocated CETA cart, lubricated Canadarm’s latching end effector, attempted to deploy cargo carrier
-
Departing: Sandra Magnus, Lee Archambault, Tony Antonelli, Joseph Acaba, Stephen Swanson, Richard Arnold, John Phillips
-
Arriving: Gennady Padalka, Michael Barratt, Charles Simonyi
-
Departing: Michael Fincke, Yuri Lonchakov, Charles Simonyi
-
-
-
-
Arriving: Roman Romanenko, Frank De Winne, Robert Thirsk
-
Prepared Zvezda for the arrival of Poisk, installed docking antenna, photographed Strela-2 crane
-
Replaced Zvezda hatch with docking cone
-
-
-
-
Arriving: Timothy Kopra, Mark Polansky, Doug Hurley, Christopher Cassidy, Thomas Marshburn, David Wolf, Julie Payette
-
Kibo exposed facility installed, deployed P3 UCCAS
-
-
Installed Orbital Replacement Units onto ESP3, transferred spare equipment
-
Replaced batteries on P6
-
Completed battery replacement on P6
-
Adjusted thermal covers on Dextre, reconfigured Z1 panels, installed EF visual equipment
-
Departing: Koichi Wakata, Mark Polansky, Doug Hurley, Christopher Cassidy, Thomas Marshburn, David Wolf, Julie Payette
-
-
Arriving: Nicole Stott, Rick Sturckow, Kevin Ford, Patrick Forrester, José Hernández, Christer Fuglesang, John Olivas
-
Released ammonia tank bolts in prep for removal, retreived MISSE and EuTEF experiments from Columbus
-
Replaced ammonia tank assembly
-
Attached cables between Unity and truss structure, replaced comm sensor device, installed two GPS antennas, replaced circuit breaker
-
Departing: Timothy Kopra, Rick Sturckow, Kevin Ford, Patrick Forrester, José Hernández, Christer Fuglesang, John Olivas
-
-
-
Arriving: Jeff Williams, Maksim Surayev, Guy Laliberté
-
Departing: Gennady Padalka, Michael Barratt, Guy Laliberté
-
-
-
-
Arriving: Charlie Hobaugh, Barry Wilmore, Mike Foreman, Randy Bresnik, Leland Melvin, Robert Satcher
-
Installed spare antenna and ammonia line bracket on Unity, lubricated grapple mechanism on the Payload Orbital Replacement Unit Attachment Device on Mobile Base System, lubricated end effector of the Kibo arm, deployed S3 outboard Payload Attach System
-
Installed Grappling Adapter to On-Orbit Railing bracket and ham radio antenna to Columbus, installed wireless camera on truss, relocated Floating Potential Measurement Unit, deployed two cargo brackets
-
Installed High Pressure Gas Tank on Quest, installed MISSE 7A and 7B on ELC-2, strapped two debris panels toESP2, relocated foot restraint, released bolt on ammonia tank assembly, installed insulation covers on cameras on mobile servicing system and Canadarm2
-
Departing: Nicole Stott, Charlie Hobaugh, Barry Wilmore, Mike Foreman, Randy Bresnik, Leland Melvin, Robert Satcher
-
Departing: Frank De Winne, Roman Romanenko, Robert Thirsk
-
-
Arriving: Oleg Kotov, Timothy Creamer, Soichi Noguchi
-
-
-
Outfitting of Poisk
-
-
-
-